#22:12 - 02:12 MDT LH006 0245-0248 (full bandwidth, beams 1-4)
cd ~/MCS/sch
at 22:03 04/27/13 -f ./INIdp.sh #re-initialize and calibrate DP.  
cd ~/MCS/exec
at 22:08 04/27/13 -f ./setASP_full.sh #set ASP to full bandwidth
#sdfs LH006 (245-248) and COMFS (353) run at 22:12 MDT
cd ~/MCS/sch
at 02:14 04/28/13 -f ./INIdp.sh
cd ~/MCS/exec
at 02:19 04/28/13 -f ./setASP_split.sh

#02:24 - 03:59 MDT LH005 06-07 (split bandwidth, beams 2-3)
#sdfs (06-07) run at 02:24 MDT

#04:00 - 05:00 MDT LH005 1004-1006, COMFS 353 (split bandwidth, beams 2-4)
#LH005 sdfs (1004-1006) and COMFS sdf (353) run at 04:00 MDT

#05:05 - 06:35 MDT LH005 08-09 (full bandwidth, beams 1-4)
#sdfs (08-09) run at 05:05 MDT
cd ~/MCS/sch
at 06:40 04/28/13 -f ./INIdp.sh
cd ~/MCS/exec
at 06:45 04/28/13 -f ./setASP_split.sh
cd ~/MCS/sch
at 06:46 04/28/13 -f ./startTBN_split38.sh #run TBN (make sure the gains are set correctly in this script before running)
